Nyera Amari
Hydropower
Project Overview
Nyera Amari I & II Hydropower Project is a integrated run-of-river scheme located in the eastern district of Trashigang and Samdrup jongkhar, Bhutan. With an installed capacity of 404 MW, the project is designed to harness the flows of the Nyera Amari River system, contributing clean energy to Bhutan's eastern grid while maintaining the ecological integrity of the surrounding landscape.
NexGen Hydro Consult is provding service to update the feasibility study for the integrated project as a national partner to International consulting firm SMEC, Australia.
Client
Druk Green Power Corporation (DGPC) & ADB
Capacity
404 MW
Status
Under Feasibility study
Our Role
Support in Design & Engineering Consultancy

Technical Innovation
Our team supported design solutions tailored to the challenging terrain of eastern Bhutan. From hydraulic modelling to structural optimisation, every aspect was carefully crafted to ensure reliability and efficiency.
- Hydraulic design
- Tunnel & surge shaft design
- cost estimation & construciton methodology.
Project Impact
Nyera Amari will supply clean, reliable electricity to eastern Bhutan, supporting rural electrification and sustainable economic growth while preserving the region's natural heritage.
Interested in similar projects?
Reach out to discuss how we can support your hydropower and infrastructure initiatives.
Let's Connect